Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| report:prm [2026/06/11 13:40] – [Sprint Evaluations] team3 | report:prm [2026/06/13 19:27] (current) – [Sprint Outcomes] team3 | ||
|---|---|---|---|
| Line 815: | Line 815: | ||
| ==== Sprint Outcomes ==== | ==== Sprint Outcomes ==== | ||
| - | /* | ||
| - | //Include the outcomes of all sprint reviews (what was the sprint backlog, completion status, planned capacity vs. achieved velocity).// | ||
| - | */ | ||
| + | ==== Sprint 1 ==== | ||
| + | This subchapter documents the outcome of sprint 1. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **23/ | ||
| + | | 1 | Set up the Scrum environment | | Bernardo Josué Corr. | Everyone | | ||
| + | | 1 | Chapter 2 Background and Related Work | | Rieke Platthaus | Everyone | | ||
| + | | 1 | Filter analyse 2 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 1 | Filter analyse 1 | | Ines Margand | Everyone | | ||
| + | | 1 | Level of water analyse 2 | | Maria Włodarczyk | Everyone | | ||
| + | | 1 | Level of water analyse 1 | | Guillem Vázquez Rol. | Everyone | | ||
| + | | 1 | Structural Draft | | Guillem Vázquez Rol. | Everyone | | ||
| + | | 1 | BlackBox Diagram | | Maximilian Salmi | Everyone | | ||
| + | | 1 | Level of water | | Maximilian Salmi | Everyone | | ||
| + | | 1 | Quality of water research | | Rieke Platthaus | Everyone | | ||
| + | | 1 | Research Filters | | Ines Margand | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 1 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Set up the Scrum environment and established the project foundation. | ||
| + | * Completed initial research on water filters, water quality, and water level analysis. | ||
| + | * Produced the Structural Draft and BlackBox Diagram, and drafted the Background/ | ||
| + | |||
| + | **Progress Check:** 100% of the planned work for this sprint is finished. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 11 | ||
| + | * **Tasks Finished:** 11 | ||
| + | |||
| + | |||
| + | ==== Sprint 2 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 2. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **05/ | ||
| + | | 2 | Research possible solutions for UV-C protection | | Bernardo Josué Corr. | Everyone | | ||
| + | | 2 | Graphic Design | | Guillem Vázquez Rol. | Everyone | | ||
| + | | 2 | Update the report with feedback | | Bernardo Josué Corr. | Everyone | | ||
| + | | 2 | Update report | | Rieke Platthaus | Everyone | | ||
| + | | 2 | Make a list of materials | | Ines Margand | Everyone | | ||
| + | | 2 | Spec table with different information | | Maximilian Salmi | Everyone | | ||
| + | | 2 | Retrospectives 2 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 2 | Chapter 7 Project Development | | Guillem Vázquez Rol. | Everyone | | ||
| + | | 2 | Chapter 6 Ethical and Deontological Concerns | | Rieke Platthaus | Everyone | | ||
| + | | 2 | Chapter 5 Eco-efficiency Measures for Sustainability | | Rieke Platthaus | Everyone | | ||
| + | | 2 | Chapter 4 Marketing Strategy Development | | Maria Włodarczyk | Everyone | | ||
| + | | 2 | Chapter 2 Background and Related Work | | Rieke Platthaus | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 2 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Researched UV-C protection solutions and produced the materials list and specification table. | ||
| + | * Updated the report based on feedback and developed multiple report chapters (Marketing Strategy, Eco-efficiency, | ||
| + | * Completed graphic design work and conducted Retrospective 2. | ||
| + | |||
| + | **Progress Check:** 100% of the planned work for this | ||
| + | |||
| + | ==== Sprint 3 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 3. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **12/ | ||
| + | | 3 | Daily meeting 25/03/2026 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Daily meeting 23/03/2026 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Daily meeting 20/03/2026 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Companies research | | Unassigned | Everyone | | ||
| + | | 3 | Update background materials research | | Ines Margand | Everyone | | ||
| + | | 3 | Cardboard Model | | Ines Margand | Everyone | | ||
| + | | 3 | Practical solution for 3d system | | Maximilian Salmi | Everyone | | ||
| + | | 3 | QR code to Wiki | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Chapter Project Management | | Ines Margand | Everyone | | ||
| + | | 3 | Flyer | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Retrospective 3 | | Bernardo Josué Corr. | Everyone | | ||
| + | | 3 | Chapter 7 Project Development | | Guillem Vázquez Rol. | Everyone | | ||
| + | | 3 | Chapter 6 Ethical and Deontological Concerns | | Rieke Platthaus | Everyone | | ||
| + | | 3 | Chapter 4 Marketing Strategy Development | | Maria Włodarczyk | Everyone | | ||
| + | | 3 | Chapter 2 Background and Related Work | | Rieke Platthaus | Everyone | | ||
| + | | 3 | Structural Drawings | | Guillem Vázquez Rol. | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 3 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Built the Cardboard Model and developed the practical solution for the 3D system. | ||
| + | * Conducted companies research, updated background materials research, and produced the Flyer and Structural Drawings. | ||
| + | * Added the QR code to the Wiki, advanced multiple report chapters, and held daily stand-ups and Retrospective 3. | ||
| + | |||
| + | **Progress Check:** 100% of the planned work for this sprint is finished. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 16 | ||
| + | * **Tasks Finished:** 16 | ||
| + | |||
| + | ==== Sprint 4 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 4. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **19/ | ||
| + | | 4 | Chapter Project Management | 12 | IM | Everyone | | ||
| + | | 4 | Interim Report | 10 | RP | Everyone | | ||
| + | | 4 | Chapter 7 Project Development | 8 | GR | Everyone | | ||
| + | | 4 | Chapter 2 Background and Related Work | 9 | RP | Everyone | | ||
| + | | 4 | Retrospective 4 | 0.5 | BA | Everyone | | ||
| + | | 4 | Interim Presentation | 10 | BA | Everyone | | ||
| + | | 4 | Daily meeting 30/03/2026 | 0.5 | MS | Everyone | | ||
| + | | 4 | Daily meeting 31/03/2026 | 0.5 | MW | Everyone | | ||
| + | | 4 | Schematics Version 2 | 3 | MS | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 4 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Completed the Interim Report and Interim Presentation, | ||
| + | * Finalized Schematics Version 2 and conducted Retrospective 4. | ||
| + | * Held daily stand-up meetings to track progress. | ||
| + | |||
| + | **Progress Check:** ~89% of the planned work for this week is finished; the Chapter Project Management item remains in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 9 | ||
| + | * **Tasks Finished:** 8 | ||
| + | |||
| + | ==== Sprint 5 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 5. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **26/ | ||
| + | | 5 | Chapter Project Management | 12 | IM | Everyone | | ||
| + | | 5 | Interim Report | 10 | RP | Everyone | | ||
| + | | 5 | Schematics Version 3 | 3 | GR | Everyone | | ||
| + | | 5 | HAND IN REPORT | 0.5 | BA | Everyone | | ||
| + | | 5 | Retrospective 5 | 0.5 | MW | Everyone | | ||
| + | | 5 | Website | 3 | BA | Everyone | | ||
| + | | 5 | Application Prototype | 3 | BA | Everyone | | ||
| + | | 5 | Table of power budget | 1.5 | MS | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 5 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Finalized and handed in the Interim Report and produced Schematics Version 3. | ||
| + | * Built the Website and Application Prototype, and created the power budget table. | ||
| + | * Conducted Retrospective 5; the Chapter Project Management item remains in progress. | ||
| + | |||
| + | **Progress Check:** ~89% of the planned work for this sprint is finished; Chapter Project Management is still in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 8 | ||
| + | * **Tasks Finished:** 7 | ||
| + | |||
| + | **Scope Changes:** TRAQ-164 (Table of power budget) was added after sprint start, increasing commitment by 1.5 story points (total 33.5). | ||
| + | |||
| + | |||
| + | ==== Sprint 6 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 6. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **16/ | ||
| + | | 6 | Chapter Project Management | 12 | IM | Everyone | | ||
| + | | 6 | Video add | 2 | MW | Everyone | | ||
| + | | 6 | Check lab for pieces | 1 | MS | Everyone | | ||
| + | | 6 | 3D model video | 8 | GR | Everyone | | ||
| + | | 6 | Retrospective 6 | 0.5 | RP | Everyone | | ||
| + | | 6 | Daily Meeting 22/04/2026 | 0.5 | GR | Everyone | | ||
| + | | 6 | Daily Meeting 21/04/2026 | 0.5 | MS | Everyone | | ||
| + | | 6 | Daily meeting 20/04/2026 | 0.5 | MW | Everyone | | ||
| + | | 6 | Fix report after Interm report | 8 | RP | Everyone | | ||
| + | | 6 | Leeflet | 3 | MW | Everyone | | ||
| + | | 6 | Review Smart system schematics | 2 | MS | Everyone | | ||
| + | | 6 | Poster | 2 | IM | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 6 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Produced the 3D model video, Leaflet, and Poster, and fixed the report after the interim feedback. | ||
| + | * Reviewed the Smart System schematics, added the video, and checked the lab for pieces. | ||
| + | * Held daily stand-ups and Retrospective 6; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~92% of the planned work for this sprint is finished; Chapter Project Management is still in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 12 | ||
| + | * **Tasks Finished:** 11 | ||
| + | |||
| + | |||
| + | ==== Sprint 7 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 7. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **23/ | ||
| + | | 7 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 7 | Packing solutions | 6 | IM | Everyone | | ||
| + | | 7 | Paper | 5 | RP | Everyone | | ||
| + | | 7 | Check lab for pieces | 1 | MS | Everyone | | ||
| + | | 7 | Video add | 3 | MW | Everyone | | ||
| + | | 7 | Final list of material and components | 2 | MS | Everyone | | ||
| + | | 7 | Retrospective 7 | 0.5 | IM | Everyone | | ||
| + | | 7 | Daily Meeting 24/04/2026 | 0.5 | IM | Everyone | | ||
| + | | 7 | Daily Meeting 28/04/2026 | 0.5 | GR | Everyone | | ||
| + | | 7 | Daily Meeting 29/04/2026 | 0.6 | MS | Everyone | | ||
| + | | 7 | Add small details for 3d Video | 1 | BA | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 7 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Developed packing solutions and finalized the list of materials and components. | ||
| + | * Advanced the Paper, refined the 3D video with additional details, and completed the video add. | ||
| + | * Held daily stand-ups and Retrospective 7; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~73% of the planned work for this sprint is finished; Chapter Project Management, Packing solutions, and Paper remained open at sprint close. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 11 | ||
| + | * **Tasks Finished:** 8 | ||
| + | |||
| + | |||
| + | ==== Sprint 8 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 8. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **07/ | ||
| + | | 8 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 8 | Paper | 20 | RP | Everyone | | ||
| + | | 8 | Packing solutions | 6 | IM | Everyone | | ||
| + | | 8 | Retrospective 8 | - | RP | Everyone | | ||
| + | | 8 | Establish the costs for the aluminum bottle and plastic | 8 | BA | Everyone | | ||
| + | | 8 | 3D Model | 10 | GR | Everyone | | ||
| + | | 8 | Reviews the excel lists | 5 | MS | Everyone | | ||
| + | | 8 | Daily meeting 12/05/2026 | 0.5 | MW | Everyone | | ||
| + | | 8 | Daily meeting 13/05/2026 | 0.5 | GR | Everyone | | ||
| + | | 8 | Daily meeting 11/05/2026 | 0.5 | MS | Everyone | | ||
| + | | 8 | Deliver interm report after feedback | 8 | MW | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 8 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Built the 3D Model and established costs for the aluminum bottle and plastic. | ||
| + | * Delivered the interim report after feedback, reviewed the Excel lists, and progressed the Paper and packing solutions. | ||
| + | * Held daily stand-ups and Retrospective 8; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~82% of the planned work for this sprint is finished; Chapter Project Management and Paper remained open at sprint close. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 11 | ||
| + | * **Tasks Finished:** 9 | ||
| + | |||
| + | ==== Sprint 9 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 9. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **14/ | ||
| + | | 9 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 9 | Paper | 20 | RP | Everyone | | ||
| + | | 9 | App | 10 | BA | Everyone | | ||
| + | | 9 | Manuel | 4 | MW | Everyone | | ||
| + | | 9 | Retrospective 9 | 0.5 | MS | Everyone | | ||
| + | | 9 | 3D Printing | 5 | GR | Everyone | | ||
| + | | 9 | Fix packing Poster | 1 | IM | Everyone | | ||
| + | | 9 | Hardware configuration | 10 | MS | Everyone | | ||
| + | | 9 | Daily meetings 15/05/2026 | 0.5 | BA | Everyone | | ||
| + | | 9 | Daily meeting 18/05/2026 | 0.5 | RP | Everyone | | ||
| + | | 9 | Daily meeting 19/05/2026 | 0.5 | GR | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 9 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Completed 3D printing, hardware configuration, | ||
| + | * Fixed the packing poster and progressed the Paper and App. | ||
| + | * Held daily stand-ups and Retrospective 9; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~82% of the planned work for this sprint is finished; Chapter Project Management, Paper, and App remained open at sprint close. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 11 | ||
| + | * **Tasks Finished:** 8 | ||
| + | |||
| + | |||
| + | ==== Sprint 10 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 10. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **21/ | ||
| + | | 10 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 10 | Paper | 20 | RP | Everyone | | ||
| + | | 10 | App | 10 | BA | Everyone | | ||
| + | | 10 | Retrospective 10 | 1 | IM | Everyone | | ||
| + | | 10 | Stress test | 5 | GR | Everyone | | ||
| + | | 10 | Test of components | 5 | MS | Everyone | | ||
| + | | 10 | Soldering | 1 | MS | Everyone | | ||
| + | | 10 | Overview Paper hand in | - | MW | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 10 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Conducted the stress test and test of components, and completed soldering work. | ||
| + | * Handed in the paper overview and finalized the App and Paper. | ||
| + | * Held Retrospective 10; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~88% of the planned work for this sprint is finished; Chapter Project Management is still in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 8 | ||
| + | * **Tasks Finished:** 7 | ||
| + | |||
| + | |||
| + | ==== Sprint 11 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 11. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **28/ | ||
| + | | 11 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 11 | UV-C Light | 5 | BA | Everyone | | ||
| + | | 11 | Review the Feedback on the paper | 10 | RP | Everyone | | ||
| + | | 11 | Daily meeting 29/05/2026 | 0.5 | GR | Everyone | | ||
| + | | 11 | Daily meeting 01/06/2026 | 0.6 | GR | Everyone | | ||
| + | | 11 | Daily meeting 02/06/2026 | 0.5 | MW | Everyone | | ||
| + | | 11 | Retrospective 11 | 1 | MW | Everyone | | ||
| + | | 11 | Simulation | 12 | GR | Everyone | | ||
| + | | 11 | Power supply adjustement | 4 | MS | Everyone | | ||
| + | | 11 | Polish up report | 10 | MW | Everyone | | ||
| + | | 11 | Fix typos in test report and plan | 3 | IM | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 11 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Ran the Simulation and completed the power supply adjustment and UV-C Light work. | ||
| + | * Reviewed paper feedback, polished the report, and fixed typos in the test report and plan. | ||
| + | * Held daily stand-ups and Retrospective 11; Chapter Project Management remains in progress. | ||
| + | |||
| + | **Progress Check:** ~91% of the planned work for this sprint is finished; Chapter Project Management is still in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 11 | ||
| + | * **Tasks Finished:** 10 | ||
| + | |||
| + | |||
| + | ==== Sprint 12 ==== | ||
| + | |||
| + | This subchapter documents the outcome of sprint 12. | ||
| + | |||
| + | The following Table {{ref> | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <table tab: | ||
| + | < | ||
| + | <WRAP box center> | ||
| + | | Sprint | Task | Duration | Responsible | Involved | | ||
| + | | **04/ | ||
| + | | 12 | Chapter Project Management | 3 | IM | Everyone | | ||
| + | | 12 | UV-C Light | 5 | BA | Everyone | | ||
| + | | 12 | Final Presentation | 6 | MW | Everyone | | ||
| + | | 12 | Summary of report | 2 | MW | Everyone | | ||
| + | | 12 | Conclusion of each chapter | 5 | GR | Everyone | | ||
| + | | 12 | Work on comments of the report | 5 | RP | Everyone | | ||
| + | | 12 | Mount UV-c light assist testing | 5 | MS | Everyone | | ||
| + | | 12 | Retrospective | - | BA | Everyone | | ||
| + | </ | ||
| + | </ | ||
| + | </ | ||
| + | |||
| + | **Sprint 12 Summary:** | ||
| + | |||
| + | **Main Achievements: | ||
| + | * Prepared the Final Presentation, | ||
| + | * Mounted the UV-C light for assisted testing and addressed report comments. | ||
| + | * Held the Retrospective; | ||
| + | |||
| + | **Progress Check:** ~88% of the planned work for this sprint is finished; Chapter Project Management is still in progress. | ||
| + | |||
| + | **Effort Breakdown: | ||
| + | * **Tasks Planned:** 8 | ||
| + | * **Tasks Finished:** 7 | ||
| + | |||
| + | **Scope Changes:** TRAQ-220 (Retrospective) was added after sprint start. | ||
| ==== Sprint Evaluations ==== | ==== Sprint Evaluations ==== | ||
| /* | /* | ||
| Line 830: | Line 1308: | ||
| - | <figure fig: | ||
| <WRAP centeralign> | <WRAP centeralign> | ||
| + | <figure fig: | ||
| {{: | {{: | ||
| {{: | {{: | ||
| Line 945: | Line 1423: | ||
| ==== Summary ==== | ==== Summary ==== | ||
| + | |||
| + | |||
| + | |||
| This chapter described how the TRAQUA project was planned, organised, and managed from start to finish. Using an agile Scrum framework with weekly sprints, the team structured its work around a Jira backlog, milestone-driven prioritisation, | This chapter described how the TRAQUA project was planned, organised, and managed from start to finish. Using an agile Scrum framework with weekly sprints, the team structured its work around a Jira backlog, milestone-driven prioritisation, | ||
| + | |||
| + | <WRAP centeralign> | ||
| + | <figure fig: | ||
| + | {{: | ||
| + | < | ||
| + | </ | ||
| + | </ | ||
| + | |||
| The twelve sprints reveal a clear evolution in the team's process. Early sprints showed a recurring " | The twelve sprints reveal a clear evolution in the team's process. Early sprints showed a recurring " | ||