report:prm

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
report:prm [2026/05/26 10:38] – [Sprint Evaluations] team3report:prm [2026/05/26 10:39] (current) – [Sprint Evaluations] team3
Line 682: Line 682:
 The teams' first retrospective in Figure {{ref>fig:retro1}} showed the teams' different education backgrounds and speed, the teams' general workload, and the main idea being lost. To fix this the team decided to book a 1-hour meeting where everyone spoke for 5 min and said where they think the project should head. This helped us find common ground. Other conclusions regarding speed and workload: the team decided to meet more often to spread the workload fairly through the team.  The teams' first retrospective in Figure {{ref>fig:retro1}} showed the teams' different education backgrounds and speed, the teams' general workload, and the main idea being lost. To fix this the team decided to book a 1-hour meeting where everyone spoke for 5 min and said where they think the project should head. This helped us find common ground. Other conclusions regarding speed and workload: the team decided to meet more often to spread the workload fairly through the team. 
  
-<WRAP centeralign>+
 <figure fig:retro1> <figure fig:retro1>
 {{ :report:retrospective1.png?800 |}} {{ :report:retrospective1.png?800 |}}
  • report/prm.1779788335.txt.gz
  • Last modified: 2026/05/26 10:38
  • by team3